Skip to main content
GOV.PH  |  Philippine Standard Time:

𝐌𝐔𝐍𝐈𝐂𝐈𝐏𝐀𝐋𝐈𝐓𝐘 𝐎𝐅 𝐌𝐄𝐗𝐈𝐂𝐎 𝗦𝗜𝗧𝗨𝗔𝗧𝗜𝗢𝗡𝗔𝗟 𝗥𝗘𝗣𝗢𝗥𝗧 𝐅𝐎𝐑 𝐓𝐇𝐄 𝐄𝐅𝐅𝐄𝐂𝐓𝐒 𝐎𝐅 𝐒𝐎𝐔𝐓𝐇𝐖𝐄𝐒𝐓 𝐌𝐎𝐍𝐒𝐎𝐎𝐍 𝐄𝐍𝐇𝐀𝐍𝐂𝐄𝐃 𝐁𝐘 𝐋𝐏𝐀

September 1, 2025

𝐌𝐔𝐍𝐈𝐂𝐈𝐏𝐀𝐋𝐈𝐓𝐘 𝐎𝐅 𝐌𝐄𝐗𝐈𝐂𝐎 𝗦𝗜𝗧𝗨𝗔𝗧𝗜𝗢𝗡𝗔𝗟 𝗥𝗘𝗣𝗢𝗥𝗧 𝐅𝐎𝐑 𝐓𝐇𝐄 𝐄𝐅𝐅𝐄𝐂𝐓𝐒 𝐎𝐅 𝐒𝐎𝐔𝐓𝐇𝐖𝐄𝐒𝐓 𝐌𝐎𝐍𝐒𝐎𝐎𝐍 𝐄𝐍𝐇𝐀𝐍𝐂𝐄𝐃 𝐁𝐘 𝐋𝐏𝐀 | SEPTEMBER 1, 2025 | 9 PM
𝐀. 𝐖𝐄𝐀𝐓𝐇𝐄𝐑 𝐂𝐎𝐍𝐃𝐈𝐓𝐈𝐎𝐍 – Light to Moderate rainfall
– 𝐒𝐨𝐮𝐫𝐜𝐞: 𝐌𝐃𝐑𝐑𝐌𝐎
𝗕. 𝗙𝗟𝗢𝗢𝗗𝗜𝗡𝗚 𝗦𝗜𝗧𝗨𝗔𝗧𝗜𝗢𝗡 – Cases of flooding were reported in these barangays:
– Brgy. San Pablo (JASA Rd, Spillway, Purok 2 and 3) – 1-2 ft | Affected Population – Families 45 – Individual 325
– Brgy. San Nicolas (Purok 1 and 2, Paroba) – 1-2 ft | Affected Population – Families 35 – Individual 200
– Brgy. Eden (Purok 1) – 3 ft | Affected Population – Families 5 – Individual 17
– Brgy. San Vicente (Purok 1-7) – 1-2 ft | Affected Population – Families 300 – Individual 915
– Brgy. Sto. Rosario (Subdivision, Paralaya, Camino 2) – 2-4 ft | Affected Population – Families 420 – Individual 1,236
– Brgy. Sto Domingo (Maligaya St., Masagana St., Maningning St.) – 1-2 ft | Affected Population – Families 155 – Individual 687
– Brgy. Laput (Purok 1-4) – 2 ft | Affected Population – Families 310 – Individual 1,248
– Brgy. San Jose Matulid (Purok 2) – 2 ft | Affected Population – Families 20 – Individual 100
– Brgy. Lagundi (Tramo) – 2 ft | Affected Population – Families 120 – Individual 485
– Brgy. Laug (Purok 1) – 2 ft | Affected Population – Families 20 – Individual 75
– Brgy. Pangatlan (Purok 7) – 3 ft | Affected Population – Families 20 – Individual 216
– Brgy. San Lorenzo – 3 ft | Affected Population – Families 350 – Individual 600
– Brgy. San Jose Malino – 2 ft | Affected Population – Families 95 – Individual 215
𝐓𝐨𝐭𝐚𝐥 𝐚𝐟𝐟𝐞𝐜𝐭𝐞𝐝: 𝟏,𝟖𝟗𝟓 𝐟𝐚𝐦𝐢𝐥𝐢𝐞𝐬 / 𝟔,𝟑𝟏𝟗 𝐢𝐧𝐝𝐢𝐯𝐢𝐝𝐮𝐚𝐥
𝐒𝐨𝐮𝐫𝐜𝐞/𝐬: 𝐁𝐃𝐑𝐑𝐌𝐂
𝐂. 𝗖𝗢𝗡𝗗𝗜𝗧𝗜𝗢𝗡 𝗢𝗙 𝗗𝗜𝗞𝗘𝗦 𝗔𝗡𝗗 𝗖𝗥𝗘𝗘𝗞𝗦 – All are in normal water level
𝐃. 𝗦𝗨𝗦𝗣𝗘𝗡𝗦𝗜𝗢𝗡 𝗢𝗙 𝗖𝗟𝗔𝗦𝗦𝗘𝗦 𝗔𝗡𝗗 𝗪𝗢𝗥𝗞 – September 1, 2025 from DILG – Pampanga – Work and Classess (all levels) – Government Offices / Public and Private
𝐄. 𝐒𝐓𝐀𝐓𝐔𝐒 𝐎𝐅 𝐋𝐈𝐅𝐄𝐋𝐈𝐍𝐄𝐒
𝐈. 𝗦𝗧𝗔𝗧𝗨𝗦 𝗢𝗙 𝗥𝗢𝗔𝗗𝗦 𝗔𝗡𝗗 𝗕𝗥𝗜𝗗𝗚𝗘𝗦 – Brgy. Acli road – Not passable for light to heavy vehicles due to soil erosion as of September 1, 2025 – 6 pm – Conducted Initial assessment
𝐈𝐈. 𝗦𝗧𝗔𝗧𝗨𝗦 𝗢𝗙 𝗣𝗢𝗪𝗘𝗥 𝗦𝗢𝗨𝗥𝗖𝗘 – No case of power interruption was reported
𝐈𝐈𝐈. 𝗘𝗩𝗔𝗖𝗨𝗔𝗧𝗜𝗢𝗡
One Municipal Evacuation Center in Barangay Lagundi has been identified as part of the continuing response operations on September 1, 2025, at 8:00 PM. As of 8:30 PM, the Municipal Social Welfare and Development Office (MSWDO) is conducting an on-going assessment.
𝐈𝐕. 𝐀𝐒𝐒𝐈𝐒𝐓𝐀𝐍𝐂𝐄 𝐏𝐑𝐎𝐕𝐈𝐃𝐄𝐃
𝐕. 𝗖𝗢𝗦𝗧 𝗢𝗙 𝗗𝗔𝗠𝗔𝗚𝗘𝗦 –
𝐕𝐈. 𝐎𝐭𝐡𝐞𝐫 𝐈𝐧𝐜𝐢𝐝𝐞𝐧𝐭/𝐀𝐜𝐭𝐢𝐯𝐢𝐭𝐢𝐞𝐬 𝐌𝐨𝐧𝐢𝐭𝐨𝐫𝐞𝐝 –
– On September 1, 2025, from 9:00 AM to 9:30 AM, an initial assessment was conducted at Pritil Bridge in Barangay San Antonio together with barangay officials. By 10:00 AM, a clearing operation was carried out in the area. No damages or obstructions were reported, and the bridge was declared cleared as of 2:00 PM on the same day.
– On September 1, 2025, at 9:00 AM, an initial assessment of San Lorenzo Bridge was conducted together with the Local Chief Executive and the Vice Mayor. At the same time, a clearing operation was carried out. No casualties or damages were reported. The bridge was declared cleared as of 11:00 AM on the same day.

Please click link for more information:
https://www.facebook.com/share/p/1BUbmtBy8A/

Skip to content