𝐌𝐔𝐍𝐈𝐂𝐈𝐏𝐀𝐋𝐈𝐓𝐘 𝐎𝐅 𝐌𝐄𝐗𝐈𝐂𝐎 𝗦𝗜𝗧𝗨𝗔𝗧𝗜𝗢𝗡𝗔𝗟 𝗥𝗘𝗣𝗢𝗥𝗧 𝐅𝐎𝐑 𝐓𝐇𝐄 𝐄𝐅𝐅𝐄𝐂𝐓𝐒 𝐎𝐅 𝐒𝐎𝐔𝐓𝐇𝐖𝐄𝐒𝐓 𝐌𝐎𝐍𝐒𝐎𝐎𝐍 𝐄𝐍𝐇𝐀𝐍𝐂𝐄𝐃 𝐁𝐘 𝐋𝐏𝐀
𝐌𝐔𝐍𝐈𝐂𝐈𝐏𝐀𝐋𝐈𝐓𝐘 𝐎𝐅 𝐌𝐄𝐗𝐈𝐂𝐎 𝗦𝗜𝗧𝗨𝗔𝗧𝗜𝗢𝗡𝗔𝗟 𝗥𝗘𝗣𝗢𝗥𝗧 𝐅𝐎𝐑 𝐓𝐇𝐄 𝐄𝐅𝐅𝐄𝐂𝐓𝐒 𝐎𝐅 𝐒𝐎𝐔𝐓𝐇𝐖𝐄𝐒𝐓 𝐌𝐎𝐍𝐒𝐎𝐎𝐍 𝐄𝐍𝐇𝐀𝐍𝐂𝐄𝐃 𝐁𝐘 𝐋𝐏𝐀 | SEPTEMBER 1, 2025 | 9 PM
𝐀. 𝐖𝐄𝐀𝐓𝐇𝐄𝐑 𝐂𝐎𝐍𝐃𝐈𝐓𝐈𝐎𝐍 – Light to Moderate rainfall
– 𝐒𝐨𝐮𝐫𝐜𝐞: 𝐌𝐃𝐑𝐑𝐌𝐎
𝗕. 𝗙𝗟𝗢𝗢𝗗𝗜𝗡𝗚 𝗦𝗜𝗧𝗨𝗔𝗧𝗜𝗢𝗡 – Cases of flooding were reported in these barangays:
– Brgy. San Pablo (JASA Rd, Spillway, Purok 2 and 3) – 1-2 ft | Affected Population – Families 45 – Individual 325
– Brgy. San Nicolas (Purok 1 and 2, Paroba) – 1-2 ft | Affected Population – Families 35 – Individual 200
– Brgy. Eden (Purok 1) – 3 ft | Affected Population – Families 5 – Individual 17
– Brgy. San Vicente (Purok 1-7) – 1-2 ft | Affected Population – Families 300 – Individual 915
– Brgy. Sto. Rosario (Subdivision, Paralaya, Camino 2) – 2-4 ft | Affected Population – Families 420 – Individual 1,236
– Brgy. Sto Domingo (Maligaya St., Masagana St., Maningning St.) – 1-2 ft | Affected Population – Families 155 – Individual 687
– Brgy. Laput (Purok 1-4) – 2 ft | Affected Population – Families 310 – Individual 1,248
– Brgy. San Jose Matulid (Purok 2) – 2 ft | Affected Population – Families 20 – Individual 100
– Brgy. Lagundi (Tramo) – 2 ft | Affected Population – Families 120 – Individual 485
– Brgy. Laug (Purok 1) – 2 ft | Affected Population – Families 20 – Individual 75
– Brgy. Pangatlan (Purok 7) – 3 ft | Affected Population – Families 20 – Individual 216
– Brgy. San Lorenzo – 3 ft | Affected Population – Families 350 – Individual 600
– Brgy. San Jose Malino – 2 ft | Affected Population – Families 95 – Individual 215
𝐓𝐨𝐭𝐚𝐥 𝐚𝐟𝐟𝐞𝐜𝐭𝐞𝐝: 𝟏,𝟖𝟗𝟓 𝐟𝐚𝐦𝐢𝐥𝐢𝐞𝐬 / 𝟔,𝟑𝟏𝟗 𝐢𝐧𝐝𝐢𝐯𝐢𝐝𝐮𝐚𝐥
𝐒𝐨𝐮𝐫𝐜𝐞/𝐬: 𝐁𝐃𝐑𝐑𝐌𝐂
𝐂. 𝗖𝗢𝗡𝗗𝗜𝗧𝗜𝗢𝗡 𝗢𝗙 𝗗𝗜𝗞𝗘𝗦 𝗔𝗡𝗗 𝗖𝗥𝗘𝗘𝗞𝗦 – All are in normal water level
𝐃. 𝗦𝗨𝗦𝗣𝗘𝗡𝗦𝗜𝗢𝗡 𝗢𝗙 𝗖𝗟𝗔𝗦𝗦𝗘𝗦 𝗔𝗡𝗗 𝗪𝗢𝗥𝗞 – September 1, 2025 from DILG – Pampanga – Work and Classess (all levels) – Government Offices / Public and Private
𝐄. 𝐒𝐓𝐀𝐓𝐔𝐒 𝐎𝐅 𝐋𝐈𝐅𝐄𝐋𝐈𝐍𝐄𝐒
𝐈. 𝗦𝗧𝗔𝗧𝗨𝗦 𝗢𝗙 𝗥𝗢𝗔𝗗𝗦 𝗔𝗡𝗗 𝗕𝗥𝗜𝗗𝗚𝗘𝗦 – Brgy. Acli road – Not passable for light to heavy vehicles due to soil erosion as of September 1, 2025 – 6 pm – Conducted Initial assessment
𝐈𝐈. 𝗦𝗧𝗔𝗧𝗨𝗦 𝗢𝗙 𝗣𝗢𝗪𝗘𝗥 𝗦𝗢𝗨𝗥𝗖𝗘 – No case of power interruption was reported
𝐈𝐈𝐈. 𝗘𝗩𝗔𝗖𝗨𝗔𝗧𝗜𝗢𝗡
One Municipal Evacuation Center in Barangay Lagundi has been identified as part of the continuing response operations on September 1, 2025, at 8:00 PM. As of 8:30 PM, the Municipal Social Welfare and Development Office (MSWDO) is conducting an on-going assessment.
𝐈𝐕. 𝐀𝐒𝐒𝐈𝐒𝐓𝐀𝐍𝐂𝐄 𝐏𝐑𝐎𝐕𝐈𝐃𝐄𝐃
𝐕. 𝗖𝗢𝗦𝗧 𝗢𝗙 𝗗𝗔𝗠𝗔𝗚𝗘𝗦 –
𝐕𝐈. 𝐎𝐭𝐡𝐞𝐫 𝐈𝐧𝐜𝐢𝐝𝐞𝐧𝐭/𝐀𝐜𝐭𝐢𝐯𝐢𝐭𝐢𝐞𝐬 𝐌𝐨𝐧𝐢𝐭𝐨𝐫𝐞𝐝 –
– On September 1, 2025, from 9:00 AM to 9:30 AM, an initial assessment was conducted at Pritil Bridge in Barangay San Antonio together with barangay officials. By 10:00 AM, a clearing operation was carried out in the area. No damages or obstructions were reported, and the bridge was declared cleared as of 2:00 PM on the same day.
– On September 1, 2025, at 9:00 AM, an initial assessment of San Lorenzo Bridge was conducted together with the Local Chief Executive and the Vice Mayor. At the same time, a clearing operation was carried out. No casualties or damages were reported. The bridge was declared cleared as of 11:00 AM on the same day.
Please click link for more information: