MUNICIPALITY OF MEXICO SITUATIONAL REPORT ON SOUTHWEST MONSOON
๐๐๐๐๐๐๐๐๐๐๐๐ ๐๐
๐๐๐๐๐๐ ๐ฆ๐๐ง๐จ๐๐ง๐๐ข๐ก๐๐ ๐ฅ๐๐ฃ๐ข๐ฅ๐ง ๐ข๐ก ๐ฆ๐ข๐จ๐ง๐๐ช๐๐ฆ๐ง ๐ ๐ข๐ก๐ฆ๐ข๐ข๐ก | JULY 24, 2025 | 4 PM
๐. ๐๐๐๐๐๐๐ ๐๐๐๐๐๐๐๐๐ – Light to occasionally moderate rainfall
– ๐๐จ๐ฎ๐ซ๐๐: ๐๐๐๐๐๐
๐. ๐๐๐ข๐ข๐๐๐ก๐ ๐ฆ๐๐ง๐จ๐๐ง๐๐ข๐ก โ Cases of flooding were reported in these barangays:
– Brgy. Sto. Cristo (Sitio Highway, Sitio Kawayan, Sitio Tower, Isidro David, Station) – 2-3 ft | Affected Population – Families 185 – Individual 664
– Brgy. Lagundi (Sitio Tramo, Sitio Troso, Sitio Bulaklak, Sitio Paroba, Centro) – 1-4 ft | Affected Population – Families 835 – Individual 2,310
– Brgy. San Jose Matulid (Suha Street, Langka Street, Sampaloc, Santol Street, Makopa Street, Purok 2-6, Portion of Sto Domingo Village) – 1-3 ft | Affected Population – Families 282 – Individual 952
– Brgy. Laug (Purok 1 to 5) – 1-3 ft | Affected Population – Families 285 – Individual 810
– Brgy. Concepcion – 1-2 ft | Affected Population – Families 100 – Individual 253
– Brgy. San Antonio (Blvd, Subdivision, Inajero) – 1-2 ft | Affected Population – Families 160 – Individual 800
– Brgy. Laput (Purok 1-4) – 1-2 ft | Affected Population – Families 226 – Individual 678
– Brgy. San Rafael (Sitio Everlasting) – 1-3 ft | Affected Population – Families 20 – Individual 100
– Brgy San Roque (Purok Pagasa and Nayong Pilipino) – 1-3 ft | Affected Population – Families 15 – Individual 80
– Brgy Sabanilla – 1-2 ft | Affected Population – Families 9 – Individual 40
– Brgy. Sta Cruz (Purok 2 and 3) – 1-2 ft | Affected Population – Families 23 – Individual 130
– Brgy. San Vicente (Purok 1-7) – 1-4 ft | Affected Population – Families 300 – Individual 800
– Brgy. Sapang Maisac (Purok 1,5,6, Sta Clara Riverside) – 1-2 ft | Affected Population – Families 259 – Individual 889
– Brgy Nueva Victoria (Purok 1 and 3) – 1-2 ft | Affected Population – Families 30 – Individual 103
– Brgy. Sta Maria (Sitio Tramo, Sitio Pulo) – 1-2 ft | Affected Population – Families 35 – Individual 66
– Brgy. Sto Domingo (Maningning Street, Masagana Street, Campo, Maligaya Street) – 1-2 ft | Affected Population – Families 35 – Individual 106
– Brgy. San Carlos (Purok 1-5) – 1-3 ft | Affected Population – Families 95 – Individual 300
– Brgy. Balas (Purok 1,2, and 7) – 2 ft | Affected Population – Families 150 – Individual 510
– Brgy. Sto Rosario (Camino 1 and 2 Subdivision, Paralaya 2) – 1-3 ft | Affected Population – Families 87 – Individual 318
– Brgy. Anao (Purok Sulbang, Bana, Loban, Barrio, Villa, Dalayin) – 1-2 ft | Affected Population – Families 115 – Individual 345
– Brgy. San Nicolas (Purok 1,2, and 4) – 1-2 ft | Affected Population – Families 50 – Individual 300
๐๐จ๐ญ๐๐ฅ ๐๐๐๐๐๐ญ๐๐: ๐,๐๐๐ ๐๐๐ฆ๐ข๐ฅ๐ข๐๐ฌ / ๐๐,๐๐๐ ๐ข๐ง๐๐ข๐ฏ๐ฎ๐๐ฅ
๐๐จ๐ฎ๐ซ๐๐/๐ฌ: ๐๐๐๐๐๐
๐. ๐๐ข๐ก๐๐๐ง๐๐ข๐ก ๐ข๐ ๐๐๐๐๐ฆ ๐๐ก๐ ๐๐ฅ๐๐๐๐ฆ โ All are in normal water level
๐. ๐ฆ๐จ๐ฆ๐ฃ๐๐ก๐ฆ๐๐ข๐ก ๐ข๐ ๐๐๐๐ฆ๐ฆ๐๐ฆ ๐๐ก๐ ๐ช๐ข๐ฅ๐ โ Suspension of classes all levels public and private and gov’t offices.
๐๐จ๐ฎ๐ซ๐๐/๐ฌ: ๐๐๐๐ข๐๐ ๐จ๐ ๐๐ฎ๐ง๐ข๐๐ข๐ฉ๐๐ฅ ๐๐๐ฒ๐จ๐ซ/๐๐๐๐ข๐๐ ๐จ๐ ๐๐ซ๐จ๐ฏ๐ข๐ง๐๐ข๐๐ฅ ๐๐จ๐ฏ๐๐ซ๐ง๐จ๐ซ
๐. ๐๐๐๐๐๐ ๐๐
๐๐๐
๐๐๐๐๐๐
๐. ๐ฆ๐ง๐๐ง๐จ๐ฆ ๐ข๐ ๐ฅ๐ข๐๐๐ฆ ๐๐ก๐ ๐๐ฅ๐๐๐๐๐ฆ โ All roads, bridges, and major thoroughfares are passable to all types of vehicles.
๐๐. ๐ฆ๐ง๐๐ง๐จ๐ฆ ๐ข๐ ๐ฃ๐ข๐ช๐๐ฅ ๐ฆ๐ข๐จ๐ฅ๐๐ โ No case of power interruption was reported
๐๐๐. ๐๐ฉ๐๐๐จ๐๐ง๐๐ข๐ก
A total of 32 families and 132 individuals from Barangay Lagundi Sitio Tramo and Sitio Troso Riverside have been evacuated from their houses to the Mini Convention Center.
– 8 family (Sitio Tramo)
– 22 family (Sitio Troso Riverside)
– 2 family (Sitio Tramo) (7/24/25)
๐๐. ๐๐๐๐๐๐๐๐๐๐ ๐๐๐๐๐๐๐๐
– July 24, 2024, 100 food packs were distributed to families in Barangay Concepcion, courtesy of Congresswoman Mica Gonzales.
– July 24, 2024, 41 food packs were distributed to families in – Barangay Laput, courtesy of Congresswoman Mica Gonzales.
– July 24, 2024, 231 food packs were distributed to families in Barangay San Jose Matulid, courtesy of Congresswoman Mica Gonzales.
– July 24, 2024, 86 food packs were distributed to families in Barangay Sto. Cristo, courtesy of Congresswoman Mica Gonzales.
– July 24, 2025, 5 food packs were distributed to families in Barangay Lagundi, courtesy of MDRRM stockpile.
– July 24, 2025, 2 food packs, 2 hygiene kits, 2 sleeping kits were distributed to families in additional evacuees currently staying at the Mexico Mini Convention Center, courtesy of MDRRM stockpile.
– July 23, 2025, 127 food packs were distributed to families in Barangay Lagundi, courtesy of Congresswoman Mica Gonzales.
– July 23, 2024, a total of 30 hot meals were distributed to evacuees currently staying at the Mexico Mini Convention Center, courtesy of former Councilor Eduardo Vitangul
– July 22, 2025, 27 families temporarily staying at the Mexico Mini Convention Center in Brgy. Lagundi received 5 kilos of rice each, courtesy of Councilor Ariel Bonus.
– July 22, 2025, a total of 30 evacuees were accommodated at the Mini Convention Center due to continuous heavy rains. The Local Government Unit of Mexico, Pampanga, under the leadership of Mayor Rodencio โRudingโ Gonzales, provided food packs, hygiene kits, and sleeping kits as part of its immediate response efforts.
๐. ๐๐ข๐ฆ๐ง ๐ข๐ ๐๐๐ ๐๐๐๐ฆ –
As of 6 PM, July 23, 2025, a total of 8 barangays reported damage due to continuous heavy rains, affecting 110 farmers with crops in the newly planted, vegetative, and reproductive stages. An estimated 206 hectares of agricultural land were affected, with a total value of damage amounting to Php 3,858,600.00. Assessment is on-going.
๐๐. ๐๐ญ๐ก๐๐ซ ๐๐ง๐๐ข๐๐๐ง๐ญ/๐๐๐ญ๐ข๐ฏ๐ข๐ญ๐ข๐๐ฌ ๐๐จ๐ง๐ข๐ญ๐จ๐ซ๐๐ –
– Lagundi – On July 21, 2025 at 1800H, damage to a bridge in Brgy. Lagundi was reported due to heavy rainfall. An initial assessment was conducted from 1800H to 0800H, led by the Local Chief Executive (LCE) and the Municipal Administrator. No casualties or injuries were reported. As of 1600H, July 22, 2025, desilting operations are ongoing.
– Dolores-Piring – On July 20, 2025, from 08:00 to 08:30 AM, an initial assessment was conducted in Dolores-Piring with barangay officials following reports of fallen branches. No hazards were identified, and the area was fully cleared by 09:00 AM.
– San JoseโMatulid – On July 20, 2025, between 8:00 and 8:30 AM, an initial assessment was conducted in San JoseโMatulid for an uprooted tree, in coordination with barangay officials. Clearing operations started at 9:00 AM, and the site was fully cleared and declared safe by 11:00 AM. No casualties or property damage were reported.
Please click link for more information:
https://www.facebook.com/share/p/18a98gvEQm/